Fire Rated Plastering Repairs

Project Overview

Elysium Collective was engaged to complete urgent ceiling rectification works at a Commercial Retailer in Double Bay.
The works were required following impact damage caused by a forklift, which compromised both the 
ceiling structure and the building’s fire-rated integrity.

The scope included the repair and reinstatement of a fire-rated plasterboard ceiling system, ensuring the affected area was restored in accordance with fire compliance requirements. Our team carefully removed damaged materials, reinstated the fire-rated system using compliant materials and methods, and finished 
the area to seamlessly integrate with the existing ceiling. The project was completed efficiently to minimise disruption to store operations while ensuring safety, compliance, and long-term performance.

Project completed for Lakiss Facilities Management

ELYSIUM COLLECTIVE

+61 2 8112 4958

PO Box 383, Padstow 2211

GENERAL ENQUIRIES

FOLLOW US ON SOCIALS

©2026 Elysium Collective. All rights reserved. ABN 90 617 969 954. Trade Licence Number 32293C.

ELYSIUM COLLECTIVE

+61 2 8112 4958

PO Box 383, Padstow 2211

GENERAL ENQUIRIES

FOLLOW US ON SOCIALS

©2026 Elysium Collective. All rights reserved. ABN 90 617 969 954. Trade Licence Number 32293C.

ELYSIUM COLLECTIVE

+61 2 8112 4958

PO Box 383, Padstow 2211

GENERAL ENQUIRIES

FOLLOW US ON SOCIALS

©2026 Elysium Collective. All rights reserved. ABN 90 617 969 954. Trade Licence Number 32293C.